Description
KEPLIC is not responsible of the type or size of the footings and/or concrete foundations.The demonstrated foundation exhibits the standard size and type, however this may vary. Our clients are recommended to check with their contractors.
HIGHT OF POLE | DIAMETER “D” | DEPTH “F” | GROUT “G” | NO.OF D-16 BARS |
CENTER “C” | FOUNDATION BOLT Ø * LENGTH |
---|---|---|---|---|---|---|
16 MTR | 900 mm | 2.5 M | 80 | 12 | 400 | M30 * 900 |
12 MTR | 900 mm | 2.3 M | 60 | 12 | 380 | M30 * 600 |
10 MTR | 900 mm | 1.5 M | 60 | 12 | 380 | M30 * 600 |
8 MTR | 900 mm | 1.5 M | 50 | 12 | 300 | M30 * 600 |
4 MTR | 650 mm | 1.0 M | 40 | 4 | 230 | M20 * 400 |